Expert interventions / Virtualisation
Migrating from VMware to Proxmox or Hyper-V.
We move virtual servers to the new platform in groups, starting with a pilot and with the option to return any server. We also upgrade existing VMware, Proxmox or Hyper-V.
- Engagement
- One-off engagement, no long-term contract
- Scheduling
- Working days, cut-over outside business hours by agreement
- Deliverable
- Plan, rollback point, report and documentation
When this is needed
New VMware licensing terms
After the licensing change, renewing the subscription no longer makes sense and you need a platform that runs existing servers without changing applications.
Old hypervisor and hardware
ESXi 6.x/7.x or Hyper-V 2012/2016 without support, hosts at end of life and concern about the next upgrade.
Consolidation and a new cluster
Merging several hosts into a cluster with shared storage, Ceph or replication, and working backups.
Scope
| Technology | What we do |
|---|---|
| VMware vSphere / ESXi | Inventory, VM export and conversion, vCenter and ESXi upgrades, snapshot and VMware Tools clean-up |
| Proxmox VE | Cluster design and installation, storage (ZFS, Ceph, NFS/iSCSI), Proxmox Backup Server, VM import |
| Microsoft Hyper-V | Failover clustering, disk conversion, integration services, moves from VMware |
| Guest systems | Windows Server and Linux: drivers, network interfaces, licensing and service checks after the move |
What we do not do: we do not sell hardware or licences and do not run hosting. We build the platform on your hardware or at your provider.
How the work runs
- VMwareVM inventory
- New platformcluster, storage
- Pilotless critical VMs
- Moves in groupsservice checks
Approach
- 01
Inventory
List of VMs, dependencies, storage, networks, backups and guest licences.
- 02
Design
Target platform, move order and windows for critical servers.
- 03
Pilot
Moving a few less critical VMs and checking performance and backups.
- 04
Migration
Remaining VMs in groups, service checks and documentation handover.
What you get
- Environment inventory and migration plan
- A working target platform with backups
- A report for every server moved
- Rollback procedure for every group
- Documentation and handover to your administrator
Working together
We solve a specific technical problem as a one-off engagement. No long-term contract or retainer is needed. If you wish, we can look after the environment afterwards, but it is not a condition. You talk directly to the engineer doing the work.
Frequently asked questions
Do we have to change applications?
Usually not. The hypervisor changes, not the guest system. Drivers, network interfaces and sometimes Windows licences are adjusted.
Proxmox or Hyper-V?
It depends on whether Windows or Linux dominates, licensing, storage and your team’s experience. You get a recommendation with reasons in the design, before anything moves.
How long is each server down?
For typical VMs it is the time to copy disks plus a restart. Critical servers are moved in an agreed window outside business hours.
Tell us what you need to solve.
Keep it short: system, version, what is wrong or what needs to change, and by when. We will come back with questions and a proposed approach.