Expert interventions / Databases
Oracle, MySQL and SQL Server migration and upgrade.
We move your database to a new version, a new server or the cloud. We rehearse the whole procedure on a copy first, then cut over in an agreed window, always with a rollback point ready.
- Engagement
- One-off engagement, no long-term contract
- Scheduling
- Working days, cut-over outside business hours by agreement
- Deliverable
- Plan, rollback point, report and documentation
When this is needed
Version reaches end of support
Oracle 12c/19c, SQL Server 2014/2016 or MySQL 5.7 no longer get security fixes and the application vendor requires a newer version.
Hardware or hosting replacement
The database moves to a new server, into virtualisation or to the cloud (OCI, Azure, AWS) without losing a single record.
Changing the database engine
Moving for example from Oracle to PostgreSQL or from MySQL to MariaDB, including schema and procedure conversion and query changes.
A short allowed window
Operations can only tolerate a short outage. We prepare replication or a staged move so the cut-over itself takes as little time as possible.
Scope
| Technology | What we do |
|---|---|
| Oracle Database | Upgrades from 11g–19c to 19c/23ai, Data Pump, RMAN, Data Guard, moves to OCI or a new server |
| Microsoft SQL Server | Upgrade to a supported version, backup/restore, log shipping, Always On, compatibility level changes |
| MySQL / MariaDB | Upgrade from 5.7 to 8.x, replication during the move, character set and SQL mode checks |
| PostgreSQL | Major version upgrades (pg_upgrade, logical replication), target for migrations from Oracle |
What we do not do: we do not rewrite application logic or sell licences. Application changes are agreed with its vendor or your team.
How the work runs
- Source DBinventory, backup
- Rehearsaltiming, errors, speed
- Cut-overin agreed window
- Target DBchecks, report
Approach
- 01
Assessment
Versions, size, application dependencies, backups and allowed downtime.
- 02
Plan
Step-by-step procedure, checkpoints, success criteria and rollback procedure.
- 03
Rehearsal
Migration of a copy, application testing and measured cut-over time.
- 04
Cut-over
Live migration, data verification and support in the first days after the change.
What you get
- Migration plan with an estimated outage
- Rehearsal results and a list of issues found
- A tested rollback procedure
- Migration and data verification report
- Updated environment documentation
Working together
We solve a specific technical problem as a one-off engagement. No long-term contract or retainer is needed. If you wish, we can look after the environment afterwards, but it is not a condition. You talk directly to the engineer doing the work.
Frequently asked questions
How long will the database be unavailable?
We measure the exact time during the rehearsal on a copy. With replication or a staged move the cut-over itself is usually a matter of minutes; with backup and restore it depends on the data volume.
What if a problem appears after the migration?
The source database is kept until you approve the result. The rollback procedure is part of the plan and is tested in advance.
Do we need a management contract with you afterwards?
No. The migration is a separate engagement. We hand over the environment with documentation to you or your provider.
Do you work outside business hours?
Preparation happens on working days. The cut-over itself can take place in the evening or at the weekend by agreement, when the load is lowest.
Tell us what you need to solve.
Keep it short: system, version, what is wrong or what needs to change, and by when. We will come back with questions and a proposed approach.